What usually sits on the list

  • The structure — size, posts, finish.
  • Delivery to the street, then the path to the room.
  • Unloading, assembly, anchoring.
  • A 110–120V run to the frame.
  • Lighting, privacy, screens — if you want them on day one.

Price the project you will live with, not a kit on a white background.