What usually sits on the list
- The structure — size, posts, finish.
- Delivery to the street, then the path to the room.
- Unloading, assembly, anchoring.
- A 110–120V run to the frame.
- Lighting, privacy, screens — if you want them on day one.
Price the project you will live with, not a kit on a white background.